Problem: Installation was time consuming and hazardous. Removal caused thread galling and stud damage, sometimes requiring stud replacements
Average installation time: 2 shifts
Solution: Superbolt Multi-Jackbolt Tensioners preload studs in pure tension, eliminating thread galling and stud damage.

Installation time: 2 1/2 hours!