Power Examples:
Boiler Circ. Water Pump
Boiler Feed Pump
Feedwater Heater
High-pressure Feedwater Heater
Turbine Stop Valve
Steam Turbine Inlet Flange
Split-Case Turbine
Steam Turbine
Turbine/Generator Coupling

Press Examples:
Beckwood Press - Tie Rods
Injection Molding Press
3,250 Ton Forging Press
5,000 Ton Forging Press

Extrusion Press
Extruding Press
Particle Board Press
Stamping Press
Hepburn Bale Press
Press Anchorbolts
700 Ton Molding Machine

Compressor Examples:
Connecting Rods
Flexible Disc Coupling
Reciprocating Compressor Jamnut
Piston End Nut
Anchorbolts & Load Cells
Distance Piece

Hydro Examples:
Kaplan Blade Bolts
Kaplan Turbine, Bearing Housing
Pelton Turbine Nozzles
Turbine Wheel To Shaft
Kaplan Turbine Coupling

Mining Examples:
P&H Power Shovels
Gyratory Crusher
Marion 8750 Dragline
Hoist and Drag Drum
Split Gear
Power Shovel
applications

Petrochemical Examples:
Reactor Cover
Heat Exchanger
Ammonia Reactor
Dehydration Towers

Steel Mill Examples:
Thrust Collars: Rolling Mills
Thrust Collars
Mill Motor Nuts
Side Trimmer Nuts
Electrode Arm Assembly

Various:
Bolted Segments
Flexible Disc Coupling

 

 

Split Case Turbine


installing MJT'sProblem: The awkward bolting of this turbine amplifies the difficulties of the traditional hot bolting method. It previously required 30-45 minutes per stud to tighten using heating rods. Workers complained of the safety hazard of the heating rods and the time and effort for the bolting process.

Solution: Utilizing small air impact tools and hand torque wrenches, the entire turbine is bolted in under 4 hours at a leisurely pace. The management of the company timed the installation for each size, start to finish, for 1 worker. Following the current Superbolt procedure, air impact tools were used for most of the tightening of the jackbolts. Final calibration is done with the hand torque wrenches. The times were as follows:

2" size: 1-2 minutes

3" size: about 3 minutes

3-1/2" and 4" size: 4-5 minutes

Keep in mind, with Superbolt products, multiple workers can work simultaneously if room permits. This can be very valuable if the turbine work goes over schedule and unit generation is being lost.

With Superbolt products and enough workers, it is possible to bolt or unbolt even the largest steam turbines in only a couple of hours!