Power Examples:
Boiler Circ. Water Pump
Boiler Feed Pump
Feedwater Heater
High-pressure Feedwater Heater
Turbine Stop Valve
Steam Turbine Inlet Flange
Split-Case Turbine
Steam Turbine
Turbine/Generator Coupling

Press Examples:
Beckwood Press - Tie Rods
Injection Molding Press
3,250 Ton Forging Press
5,000 Ton Forging Press

Extrusion Press
Extruding Press
Particle Board Press
Stamping Press
Hepburn Bale Press
Press Anchorbolts
700 Ton Molding Machine

Compressor Examples:
Connecting Rods
Flexible Disc Coupling
Reciprocating Compressor Jamnut
Piston End Nut
Anchorbolts & Load Cells
Distance Piece

Hydro Examples:
Kaplan Blade Bolts
Kaplan Turbine, Bearing Housing
Pelton Turbine Nozzles
Turbine Wheel To Shaft
Kaplan Turbine Coupling

Mining Examples:
P&H Power Shovels
Gyratory Crusher
Marion 8750 Dragline
Hoist and Drag Drum
Split Gear
Power Shovel
applications

Petrochemical Examples:
Reactor Cover
Heat Exchanger
Ammonia Reactor
Dehydration Towers

Steel Mill Examples:
Thrust Collars: Rolling Mills
Thrust Collars
Mill Motor Nuts
Side Trimmer Nuts
Electrode Arm Assembly

Various:
Bolted Segments
Flexible Disc Coupling

 

 

Reactor Cover:


reactor coverProblem: Every five years the reactors have to be inspected and taken apart for maintenance. The large bolts tend to corrode with the heat and weather, causing the disassembly to be very difficult. The hydraulic tensioning devices failed to untighten the nuts, costing the customer many hours of production at great expense.

 

close up of Superbolt TensionersSolution: Superbolt medium temperature Tensioners can be installed in just two hours: 2 men for 24 pieces (M80). The small torque guarantees an accurate preload and the bolts are perfectly stretched in pure tension. Only hand tools are required for installation and removal, eliminating bulky hydraulic wrenches. The assembly can be untightened anytime and reused. Covers can be purchased to help protect against the weather.