Power Examples:
Boiler Circ. Water Pump
Boiler Feed Pump
Feedwater Heater
High-pressure Feedwater Heater
Turbine Stop Valve
Steam Turbine Inlet Flange
Split-Case Turbine
Steam Turbine
Turbine/Generator Coupling

Press Examples:
Beckwood Press - Tie Rods
Injection Molding Press
3,250 Ton Forging Press
5,000 Ton Forging Press

Extrusion Press
Extruding Press
Particle Board Press
Stamping Press
Hepburn Bale Press
Press Anchorbolts
700 Ton Molding Machine

Compressor Examples:
Connecting Rods
Flexible Disc Coupling
Reciprocating Compressor Jamnut
Piston End Nut
Anchorbolts & Load Cells
Distance Piece

Hydro Examples:
Kaplan Blade Bolts
Kaplan Turbine, Bearing Housing
Pelton Turbine Nozzles
Turbine Wheel To Shaft
Kaplan Turbine Coupling

Mining Examples:
P&H Power Shovels
Gyratory Crusher
Marion 8750 Dragline
Hoist and Drag Drum
Split Gear
Power Shovel
applications

Petrochemical Examples:
Reactor Cover
Heat Exchanger
Ammonia Reactor
Dehydration Towers

Steel Mill Examples:
Thrust Collars: Rolling Mills
Thrust Collars
Mill Motor Nuts
Side Trimmer Nuts
Electrode Arm Assembly

Various:
Bolted Segments
Flexible Disc Coupling

 

 

Boiler Circulating Water Pump


boiler circulating water pump pictureProblem:
The awkward, vertical position of this application made bolting difficult. The handling of a heavy hydraulic wrench was labor intensive, back straining and time consuming. Nut galling and stud seizure also proved to be a problem, requiring stud drilling. Delays and problems in this hot working environment is particularly strenuous for the workers.

Solution:
Superbolt Multi-Jackbolt Tensioner installation required only 1-1/2 hours. Actual tightening time was less than 45 minutes.

Two workers 180° apart were utilized to achieve uniform gasket crush during the procedure. Air impact wrenches were used for the first, second and third pass on the jackbolts. On the final pass, calibrated torque wrenches were used.

* 650°F operating temp.

* (14) 2-3/4" studs

* Superbolt product:

H650X-275-8/w