Power Examples:
Boiler Circ. Water Pump
Boiler Feed Pump
Feedwater Heater
High-pressure Feedwater Heater
Turbine Stop Valve
Steam Turbine Inlet Flange
Split-Case Turbine
Steam Turbine
Turbine/Generator Coupling

Press Examples:
Beckwood Press - Tie Rods
Injection Molding Press
3,250 Ton Forging Press
5,000 Ton Forging Press

Extrusion Press
Extruding Press
Particle Board Press
Stamping Press
Hepburn Bale Press
Press Anchorbolts
700 Ton Molding Machine

Compressor Examples:
Connecting Rods
Flexible Disc Coupling
Reciprocating Compressor Jamnut
Piston End Nut
Anchorbolts & Load Cells
Distance Piece

Hydro Examples:
Kaplan Blade Bolts
Kaplan Turbine, Bearing Housing
Pelton Turbine Nozzles
Turbine Wheel To Shaft
Kaplan Turbine Coupling

Mining Examples:
P&H Power Shovels
Gyratory Crusher
Marion 8750 Dragline
Hoist and Drag Drum
Split Gear
Power Shovel
applications

Petrochemical Examples:
Reactor Cover
Heat Exchanger
Ammonia Reactor
Dehydration Towers

Steel Mill Examples:
Thrust Collars: Rolling Mills
Thrust Collars
Mill Motor Nuts
Side Trimmer Nuts
Electrode Arm Assembly

Various:
Bolted Segments
Flexible Disc Coupling

 

 

Boiler Feed Pump


Boiler Feed Pump with two workersIntroduction:
Boiler feed pump discharge heads are one of the best applications for Superbolt in a power plant. Boiler feed pumps are very critical components where time savings during installation and removal can save the plant lost hours of generation. Often Superbolt Tensioners cost less than the replacement OEM nuts as the tensioners for these applications do not have to be made from expensive high temperature alloys.

Old Method:
Heating Rods and large impact wrench (referred to as Big Bertha).

The old method of tightening was very time consuming, posed safety hazards, and required use of the overhead crane from the turbine deck. The crane time was particularly valuable during turbine outages. Two men operated the impact while one man operated the crane.

Boiler Feed Pump close upSolution:
The installation was done using only two workers instead of three. Impacts were used followed by calibrated torque wrenches. Final torque was only 152 ft-lbs per jackbolt. Because the mechanics worked at 180° apart and followed a star pattern around the flange tightening in several steps, the gasket crush was very uniform throughout the procedure. This was verified by a field service technician from the pump company with feeler gauges.

This very large unit has only one boiler feed pump. If the pump should ever require an element change out forcing an unscheduled outage, the time saved removing the tensioners will save generation time.

Even worse, should a nut seize on a stud during an emergency element change out, stud removal can take up to 8 hours or more.

With Superbolt Tensioners, the main thread does not slide while under load so thread galling and seizure is eliminated.